The
|
Pre SheetRock Phase two is now up including unit wall framing. Now is the time to string A/V coax as well as a computer local area network. Over 1000 feet later it all came together at the Central Panel as depicted in the last picture. The sunset picture was my first sunset while stringing the cable.
|